Newly Released Tappan Zee Bridge Plans (From 01.18.13)

THESE ARE THE NEWLY RELEASED TAPPAN ZEE BRIDGE PLANS AS OF 1/18/13. BEGINNING IN MARCH A NEW SET OF 6 foot PILINGS WILL BE DRIVEN, (AS OPPOSED TO THE 8 foot PILINGS DRIVEN LAST YEAR) AS AN ENGINEERING TEST TO SUPPORT THESE NEW PLANS. Once the 6 foot pilings are driven, they will be cut off. By June the dredging will begin on either side of new new Tappan Zee Bridge area.

tz plans

Click Here to view more the letter from the NYS Thruway Authority to the NYS DEC (plans included).